2. INSTALLATION
2. Pre-Installation, continued
Torque Requirements
Torque all AC wiring connections to 16 inch pounds. Torque DC cable connections to
10-12 foot pounds.
AC Main Panel
If the installation will be powering a wide-range of appliances throughout the vehicle,
an AC main panel is often recommended. This is simila r in appearance and function as your home’s
circuit breaker panel, providing an additional level of control and protection for the
various circuits. Always refer to electrical codes for safe wiring practices.
Circuit Protection
If using a AC main panel fo r distribution, always use breakers that provide the
correct ampere branch circuit protection in accordance with the National Electric
Code. The breakers must also be properly rated for the appliances that will be powered.
NOTE: Both AC and DC disconnects / overcurrent protection must be provided as part of
the installation.
Wire Routing
Determine all wire routes throughout the vehicle both to and from the inverter.
Conductors that are at risk to physical damage must be protected by conduit, tape, or placed in a
raceway. Conductors passing through walls, bulkheads or other structural members must be
protected to minimize insulation damage such as chafing. During the installation, always avoid
placing conductors near sources of chafing caused by vibration or constant rubbing.
CAUTION: Always check for existing electrical, plumbing or other areas of potential damage prior to
making cuts in structural surfaces, bulkheads or walls.
Typical routing scenarios are:
AC Input wiring from the shore power source to the inverter
AC Input wiring from a generator (optional) to the inverter
DC Input wiring from the batteries to the inverter
AC Output wiring from the inverter to the coach’s AC main panel or to dedicated
circuits
Battery Temperature Sensor cable (optional) from the inverter to the batteries
Remote Control cable (optional) to the inverter
Ground wiring from the inverter to an external vehicle ground